Memorial Pool Builders Get a Free Quote
Resort pool framed by palm trees with shaded loungers

Custom Pool Builder Serving Memorial Villages, TX

The Memorial Villages, Hunters Creek Village, Piney Point Village, Hedwig Village, and Bunker Hill Village, are each their own incorporated city, which means permitting can run through a different village office depending on which one your lot sits in.

15+ years building pools in Texas

Get a Free Quote

Tell us about your project and we’ll follow up within one business day.

What We Build

15+years building pools in Texas
20+industry awards
99%client satisfaction
1single builder, design through completion
Lifetimestructural warranty on the pool shell
$1M+general liability insurance

How a Project Works

Every project runs through the same four phases, managed by one team from first walkthrough to final plaster: single-builder accountability, not a chain of subcontractors.

  1. 1

    Site & Consultation

    A walk of your property to evaluate soil, drainage, setbacks, and what you actually want to use the space for, before anything is designed.

  2. 2

    Design & Planning

    A plan built around your home, lot, and budget, not a catalog shape. This is also where financing options and a firm timeline get locked in.

  3. 3

    Construction

    Excavation, steel, gunite or shell-set, plumbing, and electrical, managed phase to phase by the same team that designed the project.

  4. 4

    Final Details

    Decking, plaster or finish, equipment start-up, water balance, and a walkthrough before your pool is ready to use.

Local Notes

Because each Memorial Village is its own municipality, pool permits are pulled through that specific village rather than one shared county office, and that permitting path is confirmed as part of design planning. Memorial-area lots also tend to carry mature tree canopy, so tree-preservation and root-protection zones are part of the site evaluation before a pool footprint is set.

What clients say:

“The whole process was smooth from the first walkthrough to the final plaster. One team the entire way, no passing us between subcontractors.”

— Jenny Wilson

“Communication was the best part. We always knew what phase we were in and what was next.”

— Michael R.

“They designed around our actual yard instead of pushing a cookie-cutter shape on us. Quality of the build has held up.”

— Sarah M.

Frequently Asked Questions

What types of pools do you build?

We build custom gunite (concrete) pools and fiberglass pools, plus patio and outdoor-living renovations and repair/resurfacing work on existing pools. Gunite is fully custom-shaped and engineered for Texas clay soils; fiberglass installs faster with a lower-maintenance gel-coat finish.

How long does it take to build a pool?

A gunite pool typically runs several months from permitting through final plaster because it is built in sequential phases (excavation, steel, gunite, plumbing/electrical, decking, finish, start-up). A fiberglass pool is faster since the shell arrives pre-manufactured and is set in one piece, cutting weeks off the construction phase.

Do you handle permits and HOA approval?

Yes. Permitting and, where applicable, HOA or architectural-review approval are handled as part of the design phase before construction starts, so the project is not held up mid-build waiting on paperwork.

Is financing available?

Yes, through Foundation Finance and Lyon Financial, both of which offer financing built for pool and backyard construction. Financing terms are discussed during the design and planning step.

Do Hunters Creek, Piney Point, Hedwig, and Bunker Hill each have different permit rules?

Yes. Each Memorial Village is its own incorporated city with its own permitting office, so the specific requirements depend on which village your property is in. That is confirmed during the design step, not left for you to track down.

Will a pool build damage large trees on a Memorial-area lot?

Mature tree canopy is common on Memorial-area lots, so root-protection zones and excavation limits around large trees are mapped out during the site evaluation, before the pool footprint is finalized.

See all FAQs →

Ready to start your project?

Get a Free Quote